Vendors are selected for this project.

Request created
Sep 25, 2023

Process details:

This is how the client describes their process:

An Automation Solution

I have a process in my production that I would like to automate.
I am looking for suppliers and solution proposals to help me figure out how to proceed with my automation project.

Number of fulltime operators (FTE) involved in the process:

Current number (before automation): 8.00

Expected number (after automation): 8.00

Manufactured units produced in the process per week:

Current number (before automation): 600000.00

Expected number (after automation): 600000.00

Deadline for Budgetary Quotes:

I need the suppliers to submit Budgetary Quotes before: No deadlines

Customer details:

This is what the client says about their current robot solution:

Location:

I need the automation solution installed at the following location:

  • United States, Michigan
Industry:

My company is doing business in the following industry::

  • Rubber & Plastic
Product:

The product that my company is producing is specified as::

  • Not specified
Process types:

These are the process types that I want to automate::

Inspection & Quality Control
  • Counting
  • Other inspection & QC
  • Quality Control
  • Testing
Process description:

Steps in the process that client wants to automte:

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa. Cum sociis natoque penatibus et magnis dis parturient montes, nascetur ridiculus mus. Donec quam felis, ultricies nec, pellentesque eu, pretium quis, sem. Nulla consequat massa quis enim. Donec pede justo, fringilla vel, aliquet nec, vulputate eget, arcu. In enim justo, rhoncus ut, imperdiet a, venenatis vitae, justo. Nullam dictum felis eu pede mollis pretium. Integer tincidunt. Cras dapibus. Vivamus elementum semper nisi. Aenean vulputate eleifend tellus.

Automation goals:

The reasons behind automating the proceses:

  • I want to improve product quality and uniformity
  • I want to increase productivity

Further explanation:

The focus of this project is to have an automated system that is effective and efficient for the quality control/inspection portion of our process. Packing the part into boxes and moving the parts to an inspection area can still be done by the operators for now.

Timeframe:

Expected timeframe for the solution to be installed:

Timeframe to install solution:

I need the automation solution to be installed: Within half a year

Further explanation:

We do not have a specific timeline or budget. Sooner the better. Given the capability of the solution, we'll understand how to justify cost.

Pictures, videos & additional documents

The client has attached the following pictures, videos and documents to support their request description.

Uploaded document
Uploaded document
Uploaded document
Uploaded document
Uploaded document